case study 1 header

Process Building – Ventilation Rebalancing Project

Process Building – Ventilation Rebalancing Project

Project Overview

A ventilation optimisation and balancing project was undertaken in one of our clients process buildings to reduce excessive air supply volumes while maintaining required environmental and safety conditions.

Challenge

The buildings ventilation system was operating at significantly higher airflow rates than required, resulting in:

  • Excessive heating demand
  • Increased fan energy consumption
  • Unnecessary carbon emissions
  • Higher operational costs

Solution

The ventilation system was rebalanced to reduce airflow rates to levels more closely aligned with operational requirements.

Airflow Optimisation

Metric

Before

After

Supply airflow

8.904 m³/s

6.844 m³/s

Reduction

2.06 m³/s

This represented a reduction of approximately 23% in supplied air volume.

Results

Heating Energy Savings

Metric

Annual Saving

Heating energy reduction

249,132 kWh

Carbon reduction

45.6 tonnes CO₂

Additional Opportunities

The accompanying energy assessment identified further savings opportunities through:

  • Variable speed inverter installation
  • Enhanced control strategies
  • Additional ventilation optimisation

These were all delivered in a future project for the same client.

Business Benefits

  • Reduced utility costs
  • Lower carbon footprint
  • Improved HVAC system efficiency
  • Better utilisation of existing infrastructure
  • No significant capital-intensive plant replacement required

Key Takeaway

Through careful system balancing alone, we were able to achieve annual heating savings of approximately 249 MWh and reduced carbon emissions by more than 45 tonnes of CO₂, demonstrating the value of optimisation before equipment replacement.

Let’s chat about how we can help you